
Commercial Chiller Descaling & Tube Brushing
Full mechanical descaling of Carrier 19XR centrifugal water chiller tubes, removing mineral deposits and restoring full delta-T heat transfer efficiency.

Cooling Tower Overhaul & Basin Sanitization
Replaced drift eliminators, cleaned tower fill, balanced axial fan blades, and recalibrated auto-fill float valves.

Central AC System Ductwork & Air Balancing
Engineered galvanized ductwork routing across 3 building stories, including fire dampers and digital zone thermostats.

Large Capacity Walk-In Cold Room Installation
Custom commercial walk-in refrigeration maintaining steady -18°C temperature with dual redundant condensing units.

York YK Chiller Electronic Sensor & VSD Servicing
Sensor overhaul including transducer calibration, thermistor replacement, and York VSD synthetic coolant renewal.

Multi-Zone High-Efficiency Inverter Installation
Installation of 8 multi-split DC inverter systems with energy monitoring, lowering power consumption by 35%.
Have a Complex HVAC Project In Mind?
Our engineering team handles full lifecycle design, procurement, installation, and warranty maintenance across Jamaica.
